Critical Process and Factors for Ex-Post Evaluation of Public-Private Partnership Infrastructure Projects in Indonesia

机译:印度尼西亚公私合营基础设施项目事后评估的关键过程和因素

获取原文
获取原文并翻译 | 示例

摘要

Public-private partnerships (PPPs) are widely used in many countries and are considered a useful strategy for developing public infrastructure. One way to identify the factors that contribute to the success or failure of a project is by conducting ex post evaluation, which is an evaluation of a development intervention that has already been completed. However, ex post evaluation of PPP projects in Indonesia is not well developed. The poor implementation results from insufficient information about ex post evaluation process and the critical factors to be evaluated. Therefore, the purpose of this study was to identify the important aspects of the evaluation process and factors that should be considered in the ex post evaluation of PPP projects in Indonesia infrastructure. The important aspects of the evaluation process were analyzed using descriptive statistics while the evaluation factors were analyzed using exploratory factor analysis and two-dimensional (2D) quadrant analysis. The analysis results showed that the three most important aspects of the evaluation process were review and acceptance of evaluation by appropriate parties, documentation of information used in preparing the evaluation, and purpose and intended use of the evaluation. Moreover, 24 factors to be evaluated were extracted into seven factor groups and for further explanation in three categories: institutional framework, sustainable development: economy, society, and environment, and management of project resources, cost, and time. The contribution of this study is the identification of the critical process aspects and factors to be evaluated. This knowledge can be used to improve post project quality. Therefore, ex post evaluation of PPP project can be performed efficiently by focusing on key points, which eventually reduces the time, cost, and resources required for the evaluation.
机译:公私伙伴关系(PPPs)在许多国家被广泛使用,被认为是发展公共基础设施的有用策略。识别导致项目成功或失败的因素的一种方法是进行事后评估,这是对已经完成的开发干预措施的评估。但是,印度尼西亚对PPP项目的事后评估尚不完善。实施不佳的原因是有关事后评估过程和要评估的关键因素的信息不足。因此,本研究的目的是确定评估过程的重要方面以及在印尼基础设施的PPP项目事后评估中应考虑的因素。使用描述性统计数据分析了评估过程的重要方面,同时使用探索性因素分析和二维(2D)象限分析来分析评估因素。分析结果表明,评估过程中最重要的三个方面是有关方面对评估的审查和接受,准备评估所用信息的文档以及评估的目的和预期用途。此外,将要评估的24个因素分为七个因素组,并在以下三个类别中作进一步说明:制度框架,可持续发展:经济,社会和环境,以及项目资源,成本和时间的管理。这项研究的作用是确定关键过程方面和要评估的因素。这些知识可用于提高后期项目质量。因此,通过重点关注关键点,可以对PPP项目进行事后评估,从而最终减少评估所需的时间,成本和资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号