Paradox of Bias and Impartiality in Facilitating Construction Dispute Resolution

机译:促进建设纠纷解决方面的偏见与公正性的悖论

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Construction contracts are inevitably incomplete due to the impossibility of foreseeing all future contingencies that may necessitate reallocation of duties and thus renegotiation of contract terms. Moreover, adjustments of contract terms may invite opportunistic moves by contracting parties that may create disputes. If disputes are not resolved promptly, protracted resolution is resource-heavy. In this regard, third-party neutrals have been involved to facilitate more efficient resolution. Third-party neutrals are jointly selected by contracting parties as facilitators in construction project dispute resolution (CPDR). Thus, they are expected to be impartial in conducting their services. However, third-party neutrals are humans who are inevitably subject to unintended judgment flaws. This study aims to explore the possibility of third-party neutrals being affected by judgmental biases. Practicing construction professionals were invited to take the role of third-party neutral in a CPDR simulation wherein opportunistic behaviors were embedded. Respondents were asked to report their assessments about the contactors' level of opportunism in two parts (Parts A and B) of the simulation. The simulation has been designed with events indicating a stronger level of opportunism in Part A and a more pragmatic level in Part B. The design therefore hypothesizes that the respondents would return different ratings for Parts A and B. However, in this study, similar ratings were received in general, thus suggesting their assessments might have been affected by bias. In this connection, two forms of bias are possible: anchoring and confirmation. The findings raise caveats for CPDR third-party neutrals, especially standing neutrals like dispute resolution advisors who follow through a project from commencement to completion. The standing nature of their services may expose them to judgmental biases.
机译:由于不可能预见可能需要重新分配职责的未来违规行为,因此建造合同不可避免地不完整,从而重新谈判合同条款。此外,合同条款的调整可能会通过可能会产生争议的缔约方邀请机会主义移动。如果纠纷暂时无法解决,则延长分辨率是资源重的。在这方面,已经参与了第三方中性,以促进更有效的决议。第三方中性通过缔约方作为建设项目纠纷解决方案(CPDR)的辅导员共同选择。因此,预计在进行其服务方面将是公正的。然而,第三方中立者是人类不可避免地受到意外判断缺陷的影响。本研究旨在探讨受评判偏差影响的第三方中性的可能性。邀请练习专业人士参加第三方中立在CPDR模拟中的作用,其中嵌入了机会行为。要求受访者报告他们在模拟的两部分(A和B部分A和B)中对接触者的机会主义程度的评估。模拟已经设计有表明A部分A的较强机会主义水平的事件以及B部分中的更务实的水平。因此,设计假设受访者将返回零部件A和B的不同评级。然而,在本研究中,类似的评级一般收到,因此建议他们的评估可能受到偏见的影响。在这方面,可以进行两种形式的偏差:锚固和确认。该研究结果为CPDR第三方中立,特别是站立中学措施,如争议解决顾问,如开始到完成。他们的服务的常设性质可能会使它们暴露于判断偏见。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号