...
首页> 外文期刊>Journal of legal affairs and dispute resolution in engineering and construction >Using BIM to Identify Claims Early in the Construction Industry: Case Study
【24h】

Using BIM to Identify Claims Early in the Construction Industry: Case Study

机译:使用BIM识别建筑行业中的早期索赔:案例研究

获取原文
获取原文并翻译 | 示例

摘要

The construction industry is permeated with claims that result from changes in quantities, quality, specifications, and many other issues. One way to minimize the effect of these claims is handling them in a proactive manner; this allows the project parties to foresee the potential claims and take necessary measures to avoid them. Thus, project parties will share common goals and achieve project success. This research introduces a building information modeling (BIM)-based claims analysis and evaluation model. Firstly, different claim causes are represented from previous research efforts. Secondly, claim automation and delay analysis methods are introduced. Thirdly, the research methodology is displayed to show how to forecast potential claims and quantify them using the proposed framework. Afterwards, a case study is presented to demonstrate how the proposed framework can be applied on and produce the required result. Finally, a claim report is generated showing actual and potential claims, their causes, evaluation, and recommendations to derogate their consequences.
机译:由于数量,质量,规格和许多其他问题的变化,建筑行业充满了索赔。最小化这些要求的影响的一种方法是主动处理它们。这使项目各方可以预见潜在的索赔,并采取必要的措施避免索赔。因此,项目各方将共享共同的目标并取得项目成功。本研究介绍了一种基于建筑物信息模型(BIM)的索赔分析和评估模型。首先,从先前的研究工作中可以得出不同的索赔原因。其次,介绍了索赔自动化和延迟分析方法。第三,展示了研究方法,以显示如何使用建议的框架预测潜在索赔并对其进行量化。之后,将进行案例研究,以演示如何将建议的框架应用于并产生所需的结果。最后,将生成一份索赔报告,其中显示了实际和潜在的索赔,其起因,评估以及减轻其后果的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号