首页> 外文期刊>Journal of information and computational science >Power Project Financing Risk Assessment with AHP-grey Vague CIM Model
【24h】

Power Project Financing Risk Assessment with AHP-grey Vague CIM Model

机译:基于AHP灰色Vague CIM模型的电力项目融资风险评估

获取原文
获取原文并翻译 | 示例
       

摘要

Electric power project is usually in long construction cycle, with large scale, and complex technology. All these characters make the power projects more risky in financing than the other construction projects. The paper combines the grey vague CIM model with AHP, and proposes a quantitative method to power project financing risk assessment. Example applications prove this proposed model's high feasibility and reliability in financing decision of power project.
机译:电力项目通常建设周期长,规模大,技术复杂。所有这些特征使电力项目比其他建筑项目更具融资风险。本文将灰色模糊CIM模型与层次分析法相结合,提出了一种量化的项目融资风险评估方法。实例应用证明了该模型在电力项目融资决策中的可行性和可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号