CONSTRUCTION SCHEDULE OPTIMIZATION FOR HIGH ARCH DAMS BASED ON REAL-TIME INTERACTIVE SIMULATION

机译:基于实时交互仿真的高拱坝施工进度优化

获取原文
获取原文并翻译 | 示例
           

摘要

The construction process of high arch dams is extremely complicated. Therefore, optimization of the construction schedule is essential for construction management to save a large amount of time and investment costs. Construction simulation is an important tool for the construction schedule optimization of high arch dams. Most current studies involving construction schedule simulations do not concurrently consider real-time construction situations and site managers' requirements. In this paper, the real-time interactive simulation is proposed that could solve this problem. The real-time construction process is the initial condition of the simulation, and the actual construction parameters are the basis of the simulation parameters. Additionally, site managers can change the simulation strategy dynamically or enter requirements based on real-time construction situations. For a simulation result, different schemes are optimized with the entropy weight method. With this method, the construction simulation can track the rapid changes in construction situations and provide a reasonable construction schedule, which increases the flexibility of the construction simulation. The optimized construction scheme could be an effective guide for site construction. With a 4D (three dimensional model and time) CAD model, the simulation process can be well expressed. A case study shows that the construction schedule can be established in real time, and it's a useful tool for decision-making.
机译:高拱坝的建造过程极为复杂。因此,优化施工进度表对于节省大量的时间和投资成本对施工管理至关重要。施工模拟是优化高拱坝施工进度的重要工具。当前大多数涉及施工进度模拟的研究都没有同时考虑实时施工情况和现场经理的要求。本文提出了可以解决这个问题的实时交互式仿真。实时施工过程是仿真的初始条件,实际施工参数是仿真参数的基础。此外,站点管理员可以动态更改模拟策略或根据实时施工情况输入要求。对于仿真结果,使用熵权法优化了不同的方案。使用这种方法,施工模拟可以跟踪施工情况的快速变化并提供合理的施工进度,从而增加了施工模拟的灵活性。优化的施工方案可能是现场施工的有效指南。使用4D(三维模型和时间)CAD模型,可以很好地表达仿真过程。案例研究表明,可以实时建立施工进度表,这是进行决策的有用工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号