首页> 外文会议>International Conference on Advances in Mechanics Engineering >Research on Construction Schedule Real-time Control of High Core Rock-fill Dam Based on Digital Monitoring
【24h】

Research on Construction Schedule Real-time Control of High Core Rock-fill Dam Based on Digital Monitoring

机译:基于数字监测的高芯岩填充水坝施工进度实时控制研究

获取原文

摘要

The real-time control of the construction schedule for the high core rock-fill dam is researched, and the construction schedule forecasting and analysis method for the high core rock-fill dam is proposed based on the real-time monitoring and simulation. According to the basic principles of schedule control, the control process of construction schedule for the high core rock-fill dam is established, and the implementation method of the dynamic adjustment and control for construction schedule of the high core rock-fill dam is put forward by comparing the current construction schedule with the plan and combining measures such as earthwork dynamic balance optimization and dynamic adjustment and optimization of construction method. The achievement has been used in a hydropower project in southwest China, which provides strong technical support for the high standard construction of the project.
机译:研究了高芯岩石填充大坝施工时间表的实时控制,基于实时监测和仿真,提出了高芯岩填充大坝的施工进度预测和分析方法。根据进度控制的基本原则,建立了高芯岩石填充大坝的施工时间表的控制过程,提出了高芯岩石填充水坝施工时间表的动态调整和控制的实现方法通过将当前的施工时间表与计划和组合措施进行比较,如土方动态平衡优化和动态调整和施工方法的优化。该成就已在中国西南部的水电项目中使用,为该项目的高标准建设提供了强大的技术支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号