首页> 外文期刊>Journal of Indian Water Works Association >Configuration of Water Transmission Network in Multi Village Schemes - Cost of Branch versus Loop Network
【24h】

Configuration of Water Transmission Network in Multi Village Schemes - Cost of Branch versus Loop Network

机译:多村车辆传输网络配置 - 分支与循环网络的成本

获取原文
获取原文并翻译 | 示例
           

摘要

Water transmission networks in multi-village water supply schemes are traditionally designed as branches. A major portion of cost of a scheme is contributed by the water transmission network Configuration of pipe line determines the cost. A cost comparison has been made designing a pipe network both as branch and loop. Cost of the loop network is lesser than the branch configuration. Besides cost reduction, loop network deserves merits of operating schemes during mending work. Study suggests loop network configuration for the water transmission networks in multi-village water supply schemes.
机译:多村供水方案中的水传输网络传统上设计为分支。方案的主要部分是由管线的水传输网络配置贡献的结果决定了成本。已经使成本比较设计为分支和循环。循环网络的成本低于分支配置。除了降低成本之外,循环网络在修补工作期间应该得到操作系统的优点。研究表明,多村供水方案中的循环网络配置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号