DESIGN OF PIPE NETWORK IN MULTI-VILLAGE WATER SUPPLY SCHEMES - A FEED BACK FROM OPERATION AND MAINTENANCE

机译:多村庄供水方案中的管道网络设计-操作和维护的反馈

获取原文
获取原文并翻译 | 示例
           

摘要

Concept of multi village water supply schemes (MVWSS) is of recent origin. A system of drawing water from a source and conveying to many villages for drinking purpose is commonly termed as multi village water supply scheme. Large pipe network occupies in multi-village water supply system. Pumping or gravity system involves depending upon the topography with booster stations/balancing reservoirs. Common analogy in the hydraulic design of pipe network is simultaneously filling up of all the service reservoirs. But, operation of the multi-village schemes has two options: ⅰ). Simultaneous filling up of all service reservoirs and ⅱ) operator based operation (i.e one by one or two etc). Head dissipating devices / flow control valves are suggested for flow division at branch points in the first case. Experience indicates that the head dissipating/flow control devices seldom render expected goal due to various practical conditions. An operator has many numbers of operating choices in the operator based operation. Most of the multi-village schemes are practically operated by the operator based operation mode against the design of simultaneous filling. An attempt has been made to demonstrate the behavior of hydraulic parameters when operator based operation is followed. Insufficient pressure head results in the pipe network during operator based operation. Moreover, it is suggested to consider peak factor in the hydraulic design of pipe network. A check for the compatibility of pipe network for the realistic operation
机译:多村庄供水计划(MVWSS)的概念是最近才出现的。从源头取水并输送到许多村庄以供饮用的系统通常被称为多村供水计划。大型管网占用多村供水系统。抽水或重力系统取决于带有增压站/平衡水库的地形。管网水力设计的常见类比是同时填满所有服务油箱。但是,多村计划的运作有两个选择:(ⅰ)。同时填满所有服务水库和ⅱ)基于操作员的操作(即一一或二等)。在第一种情况下,建议使用头耗散装置/流量控制阀在分支点进行流量分配。经验表明,由于各种实际情况,头部消散/流量控制装置很少达到预期目标。在基于操作员的操作中,操作员有许多操作选择。实际上,大多数多村计划都是由基于操作员的操作模式来操作的,而不是同时进行灌装的设计。试图证明在遵循基于操作员的操作时液压参数的行为。在基于操作员的操作过程中,压头不足会形成管网。此外,建议在管网水力设计中考虑峰值因素。检查管网的兼容性以进行实际操作

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号