The Gupo Bridge crosses the Nakdong River near the city of Busan, South Korea. During Typhoon Maemi in 2003, the old Gupo Bridge collapsed due to excessive pier scour. More recently, the highway construction on the left-bank floodplain required right-bank channel widening to restore the channel flood-carrying capacity. This 7 m deep floodplain excavation is expected to cause significant local scour around the 8-10 m wide and 3 m thick spread footings of Piers 11 and 12 of the Subway Bridge and Piers 15 and 16 of the Gupo Bridge. Three design options are examined for retrofitting floodplain bridge piers with massive spread footings. A solution with sheet piles and riprap was recommended in 2006 as the most appropriate design, but Plan III with a conical riprap structure around the footings was ultimately constructed in 2007 for economic reasons. Laboratory experiments also highlight the need to place gravel and synthetic filters under the designed riprap.
机译:古浦大桥穿过韩国釜山市附近的那空河。在2003年的Maemi台风期间,由于过分的码头冲刷,旧的Gupo大桥倒塌了。最近,左岸洪泛区的高速公路建设要求拓宽右岸河道,以恢复河道的承载能力。预计该深7 m的洪泛区开挖会在地铁桥11号和12号墩和Gupo桥15号和16号墩的8-10 m宽和3 m厚的扩展基础周围引起明显的局部冲刷。研究了三种设计方案,以扩建基础广泛的泛洪桥墩。在2006年,建议使用带有板桩和riprap的解决方案作为最合适的设计,但是出于经济原因,最终于2007年建造了带有立式圆锥形结构的Plan III计划。实验室实验还强调了将砾石过滤器和合成过滤器放置在设计的riprap下的必要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号