首页> 外文期刊>Journal of Hydraulic Engineering >Assessment of the Effectiveness of a Constructed Compound Channel River Restoration Project on an Incised Stream
【24h】

Assessment of the Effectiveness of a Constructed Compound Channel River Restoration Project on an Incised Stream

机译:拟建复式河道复垦河道工程效果评估

获取原文
获取原文并翻译 | 示例
       

摘要

Compound channels are often constructed in restoration projects on rivers and streams that have been channelized or are deeply incised. This design allows for flow over a wider cross-sectional area during high flows and is expected to reduce both flow velocities and bed-shear stresses in the channel during high flows. Using a compound channel restoration project on Tassajara Creek as a case study, the effectiveness of a constructed compound channel in reducing channel velocities and bed-shear stresses during high flow events was tested in two ways. First, since this is an a posteriori analysis, postproject surveys and assessments of the project are used to demonstrate the geomorphic and ecological benefits of the constructed compound channel for reducing further channel incision, improving channel stability, and enhancing native riparian vegetation, while still providing conveyance capacity for design flood flows. Second, the effectiveness of a constructed compound channel in reducing channel velocities and bed-shear stresses during high flow events is evaluated using both the one-dimensional (1D) model, HEC-RAS, and the three-dimensional (3D) numerical model, UnTRIM. This analysis demonstrates that the 1D analysis does not accurately portray the benefits of the compound channel, and is therefore not a suitable tool for evaluating the effectiveness of compound channel designs. These results demonstrate the advantages of using a 3D model and make a strong case for the implementation of more detailed hydrodynamic modeling in evaluating the suitability of restoration alternatives to improve the planning and design of river restoration projects.
机译:复式河道通常是在河道和河道的修复工程中建造的,这些河道和河道已被渠化或被深切。这种设计允许在高流量期间在更宽的横截面上流动,并且有望降低高流量期间通道中的流速和床剪切应力。以塔萨加拉河(Tassajara Creek)上的复合河道修复项目为例,以两种方式测试了人工建造的复合河道在降低高流速事件期间的河道速度和床剪应力方面的有效性。首先,由于这是后验分析,因此,使用项目后的调查和评估来证明所建复合河道的地貌和生态效益,可减少进一步的河道切口,改善河道稳定性并增强当地河岸植被,同时仍可提供设计洪水流量的输送能力。其次,使用一维(1D)模型,HEC-RAS和三维(3D)数值模型评估了在高流量事件期间构造的复合通道在降低通道速度和床切应力方面的有效性, UnTRIM。此分析表明,一维分析不能准确地描述复合通道的好处,因此不是评估复合通道设计有效性的合适工具。这些结果证明了使用3D模型的优势,并为更详细的水动力模型的实施提供了有力的依据,以评估修复方案的适用性,以改善河流修复项目的规划和设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号