Is Basal Reinforcement Essential for Long and Narrow Subway Excavation Bottoming Out in Shanghai Soft Clay?

机译:在上海软土中,地铁底部窄长的基坑开挖是否需要基础加固?

获取原文
获取原文并翻译 | 示例
       

摘要

Because of its great length, one subway terminal excavation in Shanghai, China, was divided into two pits for sequential construction. Although it featured an adequate earth-supporting system and the field construction followed proper procedure, wall and ground displacements of the first excavated pit were up to 1.8-2.7 times local specifications. Then, basal strata of the second pit were jet grouted. Unfortunately, worse excavation performance was tracked. Technical review of design plans, construction logs, and field data, and postconstruction investigations disclosed that for a long and narrow deep excavation bottoming out in soft clays, reinforcing basal strata prior to excavation is essential and attention should be paid to the adverse effect arising from great wall exposure length, Le, during excavation. Although both basal treatment and Le are of decisive importance, lack of suitable basal treatment imposed more adverse effect on excavation performance when Le>4He, where He = final excavation depth.
机译:由于其长度很大,中国上海的一个地铁站开挖被分为两个坑以进行顺序施工。尽管它具有足够的地面支撑系统,并且现场施工遵循了正确的程序,但第一个开挖坑的墙体和地面位移却高达当地规格的1.8-2.7倍。然后,对第二个坑的基底地层进行旋喷灌浆。不幸的是,发现了较差的开挖性能。对设计计划,施工日志和现场数据进行的技术审查以及施工后的调查表明,对于在软粘土中进行的长而窄的深基坑挖底,在开挖之前加固基础地层是必不可少的,应注意由基坑引起的不利影响开挖时长壁暴露长度Le。尽管基础处理和Le都起着决定性的作用,但是当Le> 4He时,缺乏合适的基础处理会对开挖性能产生更多不利影响,其中He =最终开挖深度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号