Factors contributing to project time and hence cost overrun in the Malaysian construction industry

机译:导致项目时间延长并因此导致马来西亚建筑业成本超支的因素

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The delivery of construction projects in Malaysia is plagued by time overruns, which turns what should have been successful projects into those incurring additional costs, or money-losing ventures; as well as leading to various other unexpected negative effects and faute de mieux situations. The purpose of this research is to assess those factors leading to time overrun in Malaysian construction projects. The perceptions of public and private sectors, contractors, clients, and consultants are compared relative to a list of factors derived from the review of extant literature in project delay. Design/methodology/approach - The research data were collected through an industry-wide questionnaire survey circulated across the Malaysian construction industry. The research develops a list of 84 time overrun factors. Responses were collected from 49 clients, 51 contractors, and 105 consultants, to explore and analyse the major factors that are responsible for causing time overrun based on sectors (public and private), organisations (clients, contractors and consultants) and professional roles. Findings - Project delays beyond contract dates are predominantly caused by contractors and are usually associated with financial factors. "Cash flow problems faced by the contractors" was found the major factor, which contributed to project delays, whereas "storage on site" was seen as the least significant factor. Practical implications - It is noteworthy that the findings in this research have a regional focus; it is, therefore, suggested that readers from other sections of the world exercise caution in applying the findings. As it is believed that every construction industry has its nature, culture and regulations, these factors can change as a result of such differences. Originality/value - This research provides stakeholders with information on factors, which, if properly understood, can make project delays less likely.
机译:目的-马来西亚的建筑项目交付受到时间超支的困扰,这会使原本应该成功的项目变成那些产生额外成本或亏损的项目;以及导致其他各种意想不到的负面影响和不利的环境。这项研究的目的是评估导致马来西亚建设项目超期的因素。将公共和私营部门,承包商,客户和顾问的看法与从项目延迟中对现有文献的回顾中得出的一系列因素进行比较。设计/方法/方法-研究数据是通过在整个马来西亚建筑业中传播的全行业问卷调查收集的。该研究列出了84个时间超限因素。收集了来自49位客户,51位承包商和105位顾问的反馈,以根据行业(公共和私营),组织(客户,承包商和顾问)和专业角色来探索和分析造成时间超支的主要因素。调查结果-超出合同日期的项目延误主要是由承包商造成的,通常与财务因素有关。发现“承包商面临的现金流问题”是造成项目延误的主要因素,而“现场存储”则被认为是最不重要的因素。实际意义-值得注意的是,这项研究的结果具有区域重点。因此,建议世界其他地区的读者在应用调查结果时应谨慎行事。由于人们相信每个建筑行业都有其性质,文化和法规,因此这些差异可能会改变这些因素。原创性/价值-这项研究为利益相关者提供了有关因素的信息,如果正确理解这些因素,可以减少项目延误的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号