Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)

机译:预设项目中造成时间和成本超支的因素研究(马来西亚案例研究)

获取原文
       

摘要

Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.
机译:成本和时间超支是任何改进风险的关键问题。这些麻烦造成了可怕的最终导致王国的交割改善和蓬勃发展。为了克服这些问题,纸张检查了对导致特派团推迟和成本的元素的主要影响。民意调查审查是为局势研究提供了各种信息收集程序的情况。来自上下文调查的发现发现,马来西亚最有说服力的因素:?1)承包商不恰当的安排,2)董事会的差点,3)合同工人经验,是最强大的因素。本文同样打破了促使任务延迟和马来西亚成本超支的正常和最不有效的正常和最不成时。它同样是揭开了延迟组分的措施,以减少对开发行业的任务推迟和成本超支的影响.???????????????????????????????????????????????????????????????????????????????????????对改善率的影响很大,可以另外没有恢复的能力。三十(30)马来西亚的大规模发展延伸在发展中的某些阶段时,马来西亚的巨大开发延伸尤其应对。在30分中,使用1100天的时间超支,5(16.67%)延伸,5(16.67%)的延伸,5(16.67%)延伸,5(16.67%)Ventures 201至300几天,三(10%)的企业已经推迟了300天的时间框架。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号