首页> 外文期刊>Journal of financial management of property and construction >Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry A case study of FPMU and MMDAs
【24h】

Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry A case study of FPMU and MMDAs

机译:将合同管理评估为实现加纳建筑业工作质量的战略工具-FPMU和MMDA案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This study aims to investigate the attainment of quality in Government of Ghana's (GoG) infrastructural projects through effective contract management and especially, relating to qualification, competence and experience of supply chain stakeholders. Design/methodology/approach - A survey questionnaire and field observations were used to collect primary data from staff of the education ministry and construction professionals. Documentary analyses of contract documents were also undertaken. Findings - The results show that executing agencies' failure to apply appropriate contract management processes was linked to the gap between stakeholders' knowledge and actual practice. This was confirmed by Spearman's rho tests of correlation between overall mean ranks given by professionals and non-professionals, which indicated strong agreement between those groups. Factors such as contractors' engagement of unqualified supervisory staff, lack of proper projects monitoring and evaluation by executing agencies mainly contribute to the poor quality of work. Research limitations/implications - Investigations were limited to the Funds and Procurement Management Unit of the Ministry of Education, Metropolitan, Municipal and District Assemblies and local contractors. Nonetheless, the methodology used could be used in future studies to analyse the socio-economic implications on the quality of education infrastructure. Practical implications - Construction is booming in Ghana but the capacity to improve the work quality through effective contract management is limited. However, with the effort of stakeholder and statutory bodies' support in capacity building initiatives, GoG projects could offer some novel solutions to improve quality of work. Social implications - Construction industry professionals and students' knowledge and perception on construction industry and contract management is significantly improved. Originality/value - This study provides information on respondents' knowledge on contract management process, which, if not properly understood, can lead to poor quality of work and loss of money.
机译:目的-本研究旨在通过有效的合同管理来调查加纳政府(GoG)基础设施项目的质量,尤其是与供应链利益相关方的资格,能力和经验有关的质量。设计/方法/方法-使用调查问卷和实地观察来收集教育部和建筑专业人士的主要数据。还对合同文件进行了文件分析。调查结果-结果表明,执行机构未能应用适当的合同管理流程与利益相关者的知识与实际做法之间的差距有关。 Spearman对专业人士和非专业人士给出的总体平均排名之间相关性的rho检验证实了这一点,这表明这些群体之间的强烈共识。承包商聘用不合格的监督人员,执行机构缺乏适当的项目监测和评估等因素,主要是造成工作质量差的原因。研究的局限性/意义-调查仅限于教育部,大都会,市政和地区议会和地方承包商的资金与采购管理部门。尽管如此,所使用的方法仍可在今后的研究中用于分析对教育基础设施质量的社会经济影响。实际意义-加纳的建筑业蓬勃发展,但通过有效的合同管理来提高工作质量的能力有限。但是,在利益相关者和法定机构在能力建设计划中的支持下,GoG项目可以提供一些新颖的解决方案来提高工作质量。社会影响-建筑行业的专业人士和学生对建筑行业和合同管理的知识和见解大大提高。独创性/价值-这项研究提供了有关受访者关于合同管理流程知识的信息,如果未正确理解这些信息,可能会导致工作质量差和金钱损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号