首页> 外文期刊>The journal of electronic defense >Advanced Components for EW (ACE) Program Lays Out Plans for New EW Capabilities
【24h】

Advanced Components for EW (ACE) Program Lays Out Plans for New EW Capabilities

机译:电子战(ACE)计划的高级组件列出了新的电子战功能的计划

获取原文
获取原文并翻译 | 示例
           

摘要

The Air Force Research Laboratory (AFRL) Sensors Directorate (Wright Patterson AFB, OH) has completed the first phase (Phase 0) of its comprehensive Advanced Components for EW (ACE) program, and it has made recommendations on how to move forward with the exponentially-rapid, EW technology development effort. Ten contracts totaling $3M were awarded to nine contractors under the program last June to create advanced components to "revolutionize future US EW capabilities that leap-ahead of the systems capabilities of others that use globally-available commercial off-the-shelf (COTS) components." As described by Dr. Stephen Hary, principal engineer, AFRL Sensors Directorate, and ACE Program Phase 0 program manager, "the focus of ACE was not to invent new technology, but to leap ahead and rapidly harvest technology - to take it and mature it beyond the 'on-the-laboratory-shelf state into EW-relevant brassboard systems ready for technology insertion at the end of a four-year time period." While Hary observes that some advancement in EW capabilities can be achieved through better Concept of Operations (CONOPS) and improved operating techniques and tactics, "the ACE program recognizes that focused investments in fundamental technology areas that don't pull from the same COTS tech base that everyone else is pulling from," are what is needed for rapid capability improvements.
机译:空军研究实验室(AFRL)传感器局(俄亥俄州莱特·帕特森空军基地)已完成其综合电子战高级组件(ACE)计划的第一阶段(第0阶段),并就如何推进电子战提出了建议。指数级快速的电子战技术开发工作。根据该计划,去年6月,该合同授予了9个承包商10份总价值300万美元的合同,以创建高级组件,以“革新未来的美国电子战能力,从而超越其他使用全球可用的商用现货(COTS)的系统能力组件。”正如AFRL传感器局,ACE计划第0阶段项目经理,首席工程师Stephen Hary博士所描述的那样,“ ACE的重点不是发明新技术,而是飞跃发展并迅速收获技术-使之变得成熟超出了“实验室搁置状态,进入了与电子战相关的黄铜板系统,准备在四年的时间结束时插入技术。”虽然哈里(Hary)指出,通过更好的运营概念(CONOPS)和改进的运营技术和策略可以实现电子战能力的某些进步,但ACE计划认识到,重点投资于基础技术领域的投资并非来自同一COTS技术基础是其他所有人都在努力的”,这是快速提高功能所需要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号