...
首页> 外文期刊>Journal of Constructional Steel Research >Long-term monitoring of steel railway bridge interaction with continuous welded rail
【24h】

Long-term monitoring of steel railway bridge interaction with continuous welded rail

机译:铁路钢桥与连续焊接轨道相互作用的长期监测

获取原文
获取原文并翻译 | 示例
           

摘要

The continuous welded rail (CWR) is nowadays standardly used on almost all modern railway bridges. However, its placement results in an interaction between CWR and the structure, which brings not only longitudinal forces on the substructure, but also significant additional stresses in the rail. These stresses can result either in the rail break, or in a track buckling. Unfortunately, input parameters for performing a numerical analysis are hardly accessible and they vary significantly in different sources. Because of that, an extensive long-time monitoring of the rail-bridge interaction was performed on a bridge with an unusual combination of ballasted track, direct fastening and a barrier in the ballast. The paper presents the results of the monitoring and shows the analysis and evaluation of formulas, defining the fastening nonlinear stiffness of track to the bridge connection. The influence of the temperature on the ballast stiffness is also analysed.
机译:如今,几乎所有现代铁路桥梁都标准使用连续焊接导轨(CWR)。但是,其放置会导致CWR与结构之间发生相互作用,这不仅会在子结构上产生纵向力,还会在钢轨上产生巨大的附加应力。这些应力可能导致轨道断裂或轨道弯曲。不幸的是,用于执行数值分析的输入参数几乎不可访问,并且在不同的来源中它们有很大的不同。因此,在具有压载轨道,直接紧固和压载物障碍物的异常组合的桥梁上,对铁路桥梁的相互作用进行了广泛的长期监控。本文介绍了监测结果,并对公式进行了分析和评估,定义了轨道到桥梁连接的紧固非线性刚度。还分析了温度对镇流器刚度的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号