Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling

机译:面向对象的3D可视化建模的高速公路路线施工比较

获取原文
获取原文并翻译 | 示例
       

摘要

The major aspects of highway planning are cut and fill calculations, cost estimation, and schedule duration planning. These items of highway planning are often complex and time consuming. Designing and comparing different alignment alternatives is even more time consuming and tends to be very costly. When planning for a new highway alignment, the general practice is to identify multiple alignment options and determine the best option based on multiple factors. This research proposes to automatically generate multiple alignment alternatives and the cut and fill quantities, costs, and schedules associated with each alternative in comparing different highway alignment alternatives. Building information modeling (BIM) technology has been increasingly used in resolving the complexity of a project in the building industry. However, the development of highway data schema and model using an object-oriented three-dimensional (3D) visualization is still underway and has not been fully implemented yet. This research proposes an object-oriented data model in compliance with ISO 10303 for highway design and construction. With the newly proposed data structure in highway design and construction, the automation of cost estimating and duration scheduling was achieved in identifying and comparing an optimum solution for alternative modeling and data output whose values provided aid in the selection process of design comparison. In summary, the explicit contribution to the body of knowledge that this paper claims is to propose a research procedure to improve current highway design and construction practices by applying a 3D object-oriented modeling approach to solve the problem of time-consuming highway planning related to alignment comparison.
机译:公路规划的主要方面是填土计算,成本估算和工期计划。这些公路规划项目通常很复杂且耗时。设计和比较不同的对齐方式更加耗时,并且往往非常昂贵。当计划新的高速公路路线时,通常的做法是确定多个路线选项,并基于多个因素确定最佳选择。这项研究建议在比较不同的公路路线替代方案时,自动生成多个路线替代方案,并与每个方案相关的挖填量,成本和进度表。建筑信息模型(BIM)技术已越来越多地用于解决建筑行业中项目的复杂性。但是,使用面向对象的三维(3D)可视化技术开发高速公路数据模式和模型仍在进行中,尚未完全实现。这项研究提出了一个符合ISO 10303的面向对象的数据模型,用于公路设计和施工。借助在公路设计和建设中新提出的数据结构,实现了成本估算和工期计划的自动化,从而确定和比较了替代建模和数据输出的最佳解决方案,其值可为设计比较的选择提供帮助。综上所述,本文所主张的对知识体系的显着贡献是提出一种研究程序,以通过应用3D面向对象的建模方法来解决涉及以下方面的耗时的高速公路规划问题,从而改善当前的高速公路设计和施工实践:比对比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号