首页> 外文期刊>Journal of Construction Engineering and Management >Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies
【24h】

Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies

机译:城市轻轨系统的替代合同安排:两个案例研究的教训

获取原文
获取原文并翻译 | 示例
           

摘要

The need to improve urban transportation systems in order to decrease travel time and increase their reliability while keeping the costs at an affordable level has led governments to develop public-private partnership (PPP) arrangements in urban light rail systems. Many cities around the world have used the PPP model for the construction of urban light rail systems, particularly light rail, since it provides a quicker and easier answer to financing these large investments. However, different models have been adopted. In most cases a typical design-build-operate-transfer model, with long duration (e.g., 30 years), is used, but other innovative models have also been adopted (e.g., a hybrid model with different contracts for infrastructure construction and maintenance-a 20-year contract-and another for the systems operation-a 5-year contract). This paper addresses the advantages and disadvantages of these models, using one case study for each model. The conclusions show that the hybrid model has the potential to decrease the operation costs, but at the same time to mitigate the interface risk (operation <-> infrastructure).
机译:需要改善城市交通系统以减少旅行时间并提高其可靠性,同时又要保持成本在可承受的水平,这导致政府在城市轻轨系统中发展了公私合营(PPP)安排。全世界许多城市已经将PPP模型用于城市轻轨系统(尤其是轻轨)的建设,因为它为资助这些大型投资提供了更快,更轻松的答案。但是,采用了不同的模型。在大多数情况下,使用了具有较长持续时间(例如30年)的典型设计,建造,运营,转让模型,但也采用了其他创新模型(例如,具有不同合同的基础设施建设和维护合同的混合模型,一份20年的合同-系统的另一份合同-5年的合同)。本文通过对每个模型进行一个案例研究,探讨了这些模型的优缺点。结论表明,混合模型具有降低运营成本的潜力,但同时可以降低接口风险(运营基础架构)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号