...
首页> 外文期刊>Journal of Construction Engineering and Management >Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System
【24h】

Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System

机译:基于组织间主动存储系统的集成项目交付方选择

获取原文
获取原文并翻译 | 示例
           

摘要

As a new delivery mode, integrated project delivery (IPD) relies on highly trust-based collaboration among project parties. Thus, selecting the appropriate parties is important for successful IPD. Although traditional selection methods, which are primarily based on only the lowest tender price or multiple criteria other than price, can help select parties that can complete an integrated project, they are not completely suitable for IPD when trust and collaborative relationship among the project parties are considered. To improve upon this shortcoming of established methods, a new method based on the concept of an interorganizational transactive memory system (I-TMS) is established in this paper. The I-TMS drives group members to be mutually trusting and cooperatively integrate their professional knowledge, which reflects the idea of collaboration that underlies IPD. In this study, party selection for IPD was achieved via two processes. First, this study developed an I-TMS rating scale and conducted a questionnaire-based analysis to verify its reliability and validity quantitatively. Second, this study selected an appropriate combination from seven combinations of party candidates. In addition, this study analyzed the appropriate combination using social network analysis (SNA). The results suggest that project parties with a low I-TMS degree should engage in frequent interaction to foster mutual cognition and trust and improve team collaboration for IPD. (C) 2015 American Society of Civil Engineers.
机译:作为一种新的交付方式,集成项目交付(IPD)依赖于项目各方之间基于高度信任的协作。因此,选择合适的参与方对于IPD成功至关重要。尽管传统的选择方法主要基于最低的投标价格或价格以外的多个标准,它们可以帮助选择可以完成一个集成项目的各方,但是当项目各方之间建立信任和协作关系时,它们并不完全适合IPD。考虑过的。为了克服现有方法的这一缺点,本文建立了一种基于组织间事务存储系统(I-TMS)概念的新方法。 I-TMS推动小组成员相互信任并合作整合他们的专业知识,这反映了IPD背后的协作理念。在这项研究中,通过两个过程实现了对IPD的参与方选择。首先,本研究制定了I-TMS评分量表,并进行了基于问卷的分析,以定量验证其可靠性和有效性。其次,本研究从七个党派候选人中选择了一个合适的组合。此外,本研究使用社交网络分析(SNA)分析了适当的组合。结果表明,具有较低I-TMS学位的项目各方应进行频繁的互动,以增进相互认知和信任,并改善IPD的团队合作。 (C)2015年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号