...
首页> 外文期刊>Journal of Construction Engineering and Management >Examining the Drivers and States of Organizational Change for Greater Use of Prefabrication in Construction Projects
【24h】

Examining the Drivers and States of Organizational Change for Greater Use of Prefabrication in Construction Projects

机译:检查组织变革的动因和状态,以在工程项目中更多地使用预制件

获取原文
获取原文并翻译 | 示例
           

摘要

Many studies have focused on the technologies and reasoning behind off-site construction and failed to address the implications to organizational change. This papaer aims to investigate the readiness of construction project organizations (CPOs) to accommodate new project environments that demand a more extensive use of prefabrication. Semistructured interviews of project managers were conducted in Melbourne, Australia. The results indicate that CPOs were well aware of the need to change operational practices in order to capitalize on the positive effects of off-site construction. A variety of practice changes were also undertaken. However, CPOs appear to be failing to fully commit to the realization of organizational change because they focused primarily on planned approaches like revising policies and performance management systems. Emergent organizational change strategies like rewarding innovation and fostering bottom-up communication are still underdeveloped. (C) 2017 American Society of Civil Engineers.
机译:许多研究都集中在异地建设背后的技术和推理上,但未能解决对组织变革的影响。本白皮书旨在调查建设项目组织(CPO)的准备情况,以适应需要更广泛使用预制件的新项目环境。在澳大利亚墨尔本进行了对项目经理的半结构化访谈。结果表明,CPO充分意识到有必要更改操作方法,以便利用异地建设的积极影响。还进行了各种实践更改。但是,CPO似乎没有完全致力于实现组织变革,因为它们主要关注计划的方法,例如修订政策和绩效管理系统。奖励创新和促进自下而上的沟通等新兴的组织变革策略仍未得到开发。 (C)2017年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号