Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams

机译:涉及跨国设计团队的高层建筑项目中承包商主导的关键设计管理因素

获取原文
获取原文并翻译 | 示例
       

摘要

High-rise building projects (HRPs) are comprised of various complex design elements. The involvement of a multinational design team increases design-related issues for contractors, which must be managed during the construction stage. Thus, contractors need to understand how appropriate design management can positively affect project performance and their profit. Identification of critical design management factors (CDMFs) can provide appropriate decision-making support for contractors, including how limited resources including money, manpower, and equipment can be allocated throughout the construction stage. This study identifies and ranks the CDMFs for HRPs designed by multinational design teams. Through a questionnaire survey in South Korea, 21 design management factors were acknowledged among 40 initial factors. Then, using factor analysis, these 21 identified CDMFs were categorized into four groups: interface management, design information, production stage, and risk contribution. Based on results, this study identifies general and regional features of design management. Because these CDMFs are chosen from the contractor's perspective, if they are used to make appropriate decisions, the overall project performance should be increased during the construction phases. (C) 2016 American Society of Civil Engineers.
机译:高层建筑项目(HRP)由各种复杂的设计元素组成。跨国设计团队的参与增加了承包商的设计相关问题,必须在施工阶段进行管理。因此,承包商需要了解适当的设计管理如何能够积极影响项目绩效及其利润。确定关键设计管理因素(CDMF)可以为承包商提供适当的决策支持,包括如何在整个施工阶段分配有限的资源,包括资金,人力和设备。这项研究确定了跨国设计团队设计的HRP CDMF并对其进行了排名。通过在韩国进行的问卷调查,在40个初始因素中确认了21个设计管理因素。然后,使用因子分析,将这21种已识别的CDMF分为四类:界面管理,设计信息,生产阶段和风险贡献。基于结果,本研究确定了设计管理的一般和区域特征。因为这些CDMF是从承包商的角度选择的,所以如果将它们用于做出适当的决定,则应在施工阶段提高总体项目绩效。 (C)2016年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号