Planning Calculations in a Multiprocessor System with Unspecified Moments of Operational Readiness

机译:具有未指定的操作准备的多处理器系统中的规划计算

获取原文
获取原文并翻译 | 示例
       

摘要

The problem of compiling an acceptable multiprocessor schedule without interruptions and switching is considered for the case when the set of partial relations is specified on the set of operations, all operations have a common deadline, and the distribution of tasks on the processors is specified. At some undetermined times, requests may be made to perform additional, higher priority operations, for which some processors are freed for a certain time. As a result, the execution of the initial set of tasks is postponed to a later time and thereby violates the schedule built for it. A strategy is developed for constructing an acceptable schedule in which the probability of its violation due to requests for additional operations is minimal.
机译:考虑在该组操作集上指定部分关系集的情况下,考虑编译可接受的多处理器计划而不中断和切换的问题,所有操作都具有常见的截止日期,并指定处理器上的任务分发。在一些未确定的时间内,可以进行请求以执行额外的,更高的优先级操作,其中一些处理器在某个时间内被释放。因此,初始任务集的执行被推迟到稍后的时间,从而违反了为其构建的计划。开发了一种策略,用于构建可接受的时间表,其中由于额外操作请求导致其违规的可能性最小。

著录项

  • 来源
  • 作者

    M. G. Furugyan;

  • 作者单位

    Federal Research Center Informatics and Control Russian Academy of Sciences Moscow 119333 Russia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 21:28:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号