首页> 美国政府科技报告 >Operational Readiness Review Implementation Plan for K Basin Sludge Water System
【24h】

Operational Readiness Review Implementation Plan for K Basin Sludge Water System

机译:K盆地污泥水系统运行准备审核实施方案

获取原文

摘要

The purpose of this ORR is to confirm the contractor's ability to safely start Sludge Waster System (SWS) operations in the K-East Basin North Loadout Pit (NLOP) and the readiness of Richland Operations Office (RL) line organization to effectively oversee the contractor. This Implementation Plan provides the overall approach and guidelines for performance of the DOE ORR at KE Basin for the NLOP activity. A separate Implementation Plan will be developed for the DOE ORR at the Radiochemical Processing Laboratory (RPL) or an alternate facility selected to treat or store the sludge packaged in the Large Diameter Containers (LDCs). Appendix A contains the Criteria and Review Approach Documents (CRADs), which define the review objectives and criteria, as well as the approach for assessing each objective. ORR results will be published in a final report.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号