...
首页> 外文期刊>Journal of Cleaner Production >Construction and demolition waste management in Saudi Arabia: Current practice and roadmap for sustainable management
【24h】

Construction and demolition waste management in Saudi Arabia: Current practice and roadmap for sustainable management

机译:沙特阿拉伯建设与拆迁废物管理:可持续管理现行实践与路线图

获取原文
获取原文并翻译 | 示例
           

摘要

The Kingdom of Saudi Arabia's (KSA) population growth has demanded that the country expand its housing and infrastructure inventory inevitably resulting in an accumulation of construction and demolition waste (C&D) that has the potential for the promotion of environmentally sound waste management practices. Prior to implementing best practices in the region, there is an impending need to first understand C&D generation in the KSA. This study investigated the current challenges for managing C&D debris in the Eastern Province region in Saudi Arabia. Likewise, it provided a roadmap and solution to manage C&D debris in relation to existing legislations and generation of C&D debris. A review of existing regulations governing C&D was conducted through the use of interviews held with relevant governmental and technical officials, over 200 surveys were administered to academic, governmental and industrial stakeholders. Data was collected from a landfill to help quantify the amount of C&D flowing through the Kingdom's Eastern Province and construction sites were observed to better understand how waste generators were disposing of C&D. Based on assessment of C&D waste generation, regulation and management policies, major issues were revealed that included: (i) lack of institution collaboration (academic, governmental and private sectors), (ii) immature strategic policies for effective C&D management and recycling, (iii) limited coordination among C&D regulators and generators, (iv) lack of motives, awareness and incentives to manage C&D, (v) lacking enforceable law for debris generators (vi) improper infrastructure for disposal of landfills and absence of treatment facilities and (vii) no suitable plan of sustainable management of landfills. C&D management can be effectively grouped by considering three major factors, mainly: (i) economic, (ii) regulatory, and (iii) technical factors. The key points include "promoting C&D waste recycling", "encouraging adoption of recycled materials to construction industry", "enforcing regulations to prohibit illegal dumping", and "landfill disposal and recycling fees for debris generators". Several other factors are also proposed and discussed within the framework of this research. Finally, potential avenues by which environmentally sound construction and demolition waste management practices can be imported for use within Saudi Arabia's unique geographical and cultural climate were introduced as a roadmap containing alternative solutions for C&D management. (C) 2019 Elsevier Ltd. All rights reserved.
机译:沙特阿拉伯(KSA)人口增长的王国要求该国扩大其住房和基础设施库存,不可避免地导致建设和拆迁废物(C&D)积累,这有可能促进无害环境废物管理实践。在在该地区实施最佳实践之前,暂时需要首先了解KSA中的C&D。本研究调查了在沙特阿拉伯东部地区管理C&D碎片的当前挑战。同样,它提供了一种路线图和解决方案,以管理关于现有立法和C&D碎片的产生的C&D碎片。通过使用相关政府和技术官员的访谈进行了对C&D的现有条例的审查,向学术,政府和工业利益攸关方提供了200多个调查。从垃圾填埋场收集数据,以帮助量化流经王国的东部省和建筑工地的C&D的数量,以便更好地了解废物发生器如何处理C&D。根据对C&D浪费产生,监管和管理政策的评估,揭示了主要问题:(i)缺乏机构协作(学术,政府和私营部门),(ii)未成熟的战略政策,以获得有效的C&D管理和回收率,( III)C&D监管机构和发电机之间的有限协调,(iv)管理C&D的动机,意识和激励措施,(v)缺乏可执行的碎片发电机(vi)的可执行法律,用于处置垃圾填埋场和缺乏治疗设施和缺乏治疗设施和(VII) )没有适当的垃圾填埋场可持续管理计划。通过考虑三个主要因素,可以有效地分组C&D管理,主要是:(i)经济,(ii)监管,(iii)技术因素。关键要点包括“促进C&D废物回收”,“鼓励采用回收材料,建设行业”,“执行法规”,禁止非法倾销“,以及”垃圾发生器填埋处置和回收费“。还提出了几个其他因素,并在本研究的框架内讨论。最后,潜在的途径可以在沙特阿拉伯在沙特阿拉伯的独特地理和文化气候中进口有环境良好的施工和拆迁废物管理实践作为C&D管理的替代解决方案的路线图。 (c)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号