...
首页> 外文期刊>Journal of Cleaner Production >Construction and demolition waste management in Saudi Arabia: Current practice and roadmap for sustainable management
【24h】

Construction and demolition waste management in Saudi Arabia: Current practice and roadmap for sustainable management

机译:沙特阿拉伯的建筑和拆迁废物管理:可持续管理的现行做法和路线图

获取原文
获取原文并翻译 | 示例
           

摘要

The Kingdom of Saudi Arabia's (KSA) population growth has demanded that the country expand its housing and infrastructure inventory inevitably resulting in an accumulation of construction and demolition waste (C&D) that has the potential for the promotion of environmentally sound waste management practices. Prior to implementing best practices in the region, there is an impending need to first understand C&D generation in the KSA. This study investigated the current challenges for managing C&D debris in the Eastern Province region in Saudi Arabia. Likewise, it provided a roadmap and solution to manage C&D debris in relation to existing legislations and generation of C&D debris. A review of existing regulations governing C&D was conducted through the use of interviews held with relevant governmental and technical officials, over 200 surveys were administered to academic, governmental and industrial stakeholders. Data was collected from a landfill to help quantify the amount of C&D flowing through the Kingdom's Eastern Province and construction sites were observed to better understand how waste generators were disposing of C&D. Based on assessment of C&D waste generation, regulation and management policies, major issues were revealed that included: (i) lack of institution collaboration (academic, governmental and private sectors), (ii) immature strategic policies for effective C&D management and recycling, (iii) limited coordination among C&D regulators and generators, (iv) lack of motives, awareness and incentives to manage C&D, (v) lacking enforceable law for debris generators (vi) improper infrastructure for disposal of landfills and absence of treatment facilities and (vii) no suitable plan of sustainable management of landfills. C&D management can be effectively grouped by considering three major factors, mainly: (i) economic, (ii) regulatory, and (iii) technical factors. The key points include "promoting C&D waste recycling", "encouraging adoption of recycled materials to construction industry", "enforcing regulations to prohibit illegal dumping", and "landfill disposal and recycling fees for debris generators". Several other factors are also proposed and discussed within the framework of this research. Finally, potential avenues by which environmentally sound construction and demolition waste management practices can be imported for use within Saudi Arabia's unique geographical and cultural climate were introduced as a roadmap containing alternative solutions for C&D management. (C) 2019 Elsevier Ltd. All rights reserved.
机译:沙特阿拉伯王国(KSA)的人口增长要求该国不可避免地扩大住房和基础设施的库存,从而导致建筑废料和拆迁废物(C&D)的积累,这有可能促进无害环境的废物管理做法。在该地区实施最佳实践之前,迫切需要首先了解KSA中的C&D生成。这项研究调查了在沙特阿拉伯东部省地区管理C&D碎片的当前挑战。同样,它提供了路线图和解决方案,以管理与现有法规和C&D碎片生成相关的C&D碎片。通过与相关政府和技术官员进行访谈,对有关C&D的现行法规进行了审查,对学术,政府和行业利益相关者进行了200多次调查。从垃圾填埋场收集数据以帮助量化流经王国东部省的拆建物数量,并观察建筑工地以更好地了解废物产生者如何处理拆建物。根据对拆建废料产生,监管和管理政策的评估,发现了以下主要问题:(i)缺乏机构合作(学术,政府和私营部门),(ii)有效进行拆建管理和回收的不成熟战略政策,( iii)C&D监管机构和生产商之间的协调有限;(iv)缺乏管理C&D的动机,意识和激励措施;(v)缺乏针对碎屑发生器的强制性法律;(vi)处置垃圾填埋场的基础设施不当以及缺乏处理设施;以及(vii )没有合适的填埋场可持续管理计划。可以通过考虑三个主要因素对C&D管理进行有效地分组,这三个主要因素主要是:(i)经济,(ii)监管和(iii)技术因素。重点包括:“促进拆建废料的回收”,“鼓励建筑业采用回收材料”,“执行禁止非法倾倒的法规”和“垃圾产生器的填埋处置和回收费”。 。在本研究的框架内还提出并讨论了其他几个因素。最后,引入了潜在途径,通过这种途径可以引入无害环境的建筑和拆除废物管理实践,以在沙特阿拉伯独特的地理和文化环境中使用,作为路线图,其中包含C&D管理的替代解决方案。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号