首页> 外文期刊>Journal of Cleaner Production >Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review
【24h】

Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review

机译:建设和拆除废物管理贡献因素加上有效废物管理的减少,重用和回收策略:审查

获取原文
获取原文并翻译 | 示例
       

摘要

Construction and demolition waste (C&DW) as a direct consequence of rapid urbanization is increasing around the world. C&DW generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of construction industry. It is estimated that an overall of 35% of C&DW is landfilled globally, therefore, effective C&DW management is crucial in order to minimize detrimental impacts of C&DW for the environment. As the industry cannot continue to practice if the resources on which it depends are depleted, C&DW management needs to be implemented in an effective way. Despite considering many well-developed strategies for C&DW management, the outputs of the implementation of these strategies is far from optimum. The main reason of this inefficiency is due to inadequate understanding of principal factors, which play a vital role in C&DW management. Therefore, the aim of this research is to critically scrutinize the concept of C&DW and its managerial issues in a systematic way to come up with the effective C&DW management. In order to achieve this aim, and based on a systematic review of 97 research papers relevant to effective C&DW management, this research considers two main categories as fundamental factors affecting C&DW management namely, C&DW management hierarchy including reduce, reuse, and recycle strategies, and effective C&DW management contributing factors, including C&DW management from sustainability perspective, C&DW stakeholders' attitudes, C&DW project life cycle, and C&DW management tools. Subsequently, these factors are discussed in detail and findings are scrutinized in order to clarify current and future practices of C&DW management from both academic and practical perspectives. (C) 2020 Elsevier Ltd. All rights reserved.
机译:建设和拆迁废物(C&DW)作为快速城市化的直接后果正在世界各地越来越多。由于其直接影响环境以及建筑业的效率,C&DW代被确定为建筑业的主要问题之一。据估计,35%的C&DW总体上填埋,因此,有效的C&DW管理是至关重要的,以尽量减少C&DW对环境的不利影响。由于该行业不能继续练习,如果它取决于它的资源耗尽,则需要以有效的方式实施C&DW管理。尽管考虑到C&DW管理的许多发达的战略,但这些策略实施的产出远非最佳。这种低效率的主要原因是对主要因素的理解不足,这在C&DW管理中发挥着至关重要的作用。因此,本研究的目的是以系统的方式批判地审查C&DW的概念及其管理问题,以提出有效的C&DW管理。为了实现这一目标,并基于97个研究论文的系统审查与有效的C&DW管理相关,这项研究将两个主要类别视为影响C&DW管理的基本因素,即C&DW管理层次结构,包括减少,重用和回收策略,以及有效的C&DW管理贡献因素,包括可持续发展视角,C&DW利益攸关方的C&DW管理,C&DW项目生命周期和C&DW管理工具。随后,详细讨论这些因素,并审查了发现,以澄清学术和实践观点的C&DW管理的当前和未来实践。 (c)2020 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号