...
首页> 外文期刊>Journal of Cleaner Production >Multi-period maintenance planning for public buildings: A risk based approach for climate conscious operation
【24h】

Multi-period maintenance planning for public buildings: A risk based approach for climate conscious operation

机译:公共建筑的多期维护计划:基于风险的注重气候的运营方法

获取原文
获取原文并翻译 | 示例
           

摘要

Improving the environmental performance of built environments has received wider interest in the recent past. Asset management is an under-utilized strategy to enhance and maintain desired environmental performance of a building at low life cycle costs (LCC). Current asset management decision making methods are not fully capable of incorporating future technological changes and complex time sensitive environmental demands. There is a knowledge gap in incorporating factors such as environmental performance, risk and time sensitivity to foster dynamic asset management decision making. This paper presents a multi-period asset management method for public buildings to minimize LCC and attain climate action goals. A scenario planning approach is used to incorporate future changes in technologies, costs and organizational policies. Risk based prioritization is used to compare and select maintenance alternatives in a given period. Value at risk is used to identify the lowest risk capital planning strategy for an organization. The proposed approach was demonstrated using an operating aquatic centre building in British Columbia, Canada. Three possible future scenario Were considered. Proposed method was used to develop multi-period maintenance plans for future scenarios. Based on the analysis, Great Transitions scenario is expected to achieve the least financial risk. The proposed approach enable capital asset planning by complying with changing climate action targets in a stochastic environment. (C) 2017 Elsevier Ltd. All rights reserved.
机译:近来,改善建筑环境的环境性能受到了广泛的关注。资产管理是一种利用不足的策略,可以以较低的生命周期成本(LCC)增强并维持建筑物的理想环境性能。当前的资产管理决策方法不能完全融合未来的技术变化和对时间敏感的复杂环境要求。在纳入环境绩效,风险和时间敏感性等因素以促进动态资产管理决策方面存在知识差距。本文提出了一种用于公共建筑的多期资产管理方法,以最小化LCC并实现气候行动目标。方案规划方法用于合并技术,成本和组织策略方面的未来更改。基于风险的优先级划分用于比较和选择给定期间内的维护方案。风险价值用于确定组织的最低风险资本计划策略。提议的方法在加拿大不列颠哥伦比亚省的一座正在运营的水上中心大楼中得到了证明。考虑了三种可能的未来方案。提议的方法用于为将来的方案制定多期维护计划。根据分析,预计“大过渡”方案的财务风险最小。所提出的方法通过在随机环境中遵守不断变化的气候行动目标来实现资本资产计划。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号