首页> 外文期刊>Journal of Civil Engineering and Management >A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS
【24h】

A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS

机译:建筑项目中浪费原因评估原因的模型

获取原文
获取原文并翻译 | 示例
           

摘要

The wastes in construction projects such as wastes in materials, time, resources and achieving customer needs can be minimized using the new philosophy of Lean Construction (LC). This paper proposed a two-level model based on fuzzy logic technique for evaluating Causes of Wastes (CWs) and lean implementation in construction projects. The probability of occurrence and importance of CWs were two input parameters in level 01 of the model, whereas the output was the level of waste. On the other hand, level 02 of the model depended on using three input parameters which were: level of waste, controllability level for CWs and lean implementation level, while the output was the lean effect. Several linguistic variables and logical rules were used for relating inputs and outputs and new indices were introduced. The model was applied and validated for data collected in two countries: Egypt and Kingdom of Saudi Arabia (KSA). Results demonstrated that the expected lean effect is found with a positive correlation with various levels of wastes and can be improved by increasing controllability and lean implementation levels. Regarding the comparative study between the two countries, distinct disparities in lean effect were clarified. Most measured CWs indices were different in both countries while indices values in KSA were higher than in Egypt either in waste, controllability or implementation levels. The results presented an optimum arrangement to reach an effective new lean evaluation model that could be implemented for moving the traditional construction towards LC. Finally, the model can be applied easily in most countries to help decision makers in evaluating CWs and lean implementation in their construction projects.
机译:使用新的精益建筑(LC)的新哲学,可以最大限度地减少施工项目,如材料,时间,资源和实现客户需求的施工项目中的废物。本文提出了一种基于模糊逻辑技术的两级模型,用于评估废物(CWS)原因和建设项目的精益实施。 CWS的发生和重要性的概率是模型01水平的两个输入参数,而输出是浪费水平。另一方面,模型的等级02依赖于使用三个输入参数,这些参数是:废物水平,CWS的可控性水平和精益的实施水平,而输出是瘦效应。使用几种语言变量和逻辑规则用于相关输入和输出,并引入了新的指标。该模型被应用并验证了两国收集的数据:埃及和沙特阿拉伯王国(KSA)。结果表明,通过与各种水平的废物相关的阳性相关性,可以通过增加可控性和精益的实施水平来提高预期的贫效果。关于两国之间的比较研究,澄清了贫效应的明显差异。两国的大多数测量CWS指数都不同,而KSA的指数值高于垃圾,可控性或实施水平。结果呈现了最佳布置,以达到有效的新精益评估模型,可以实现用于将传统结构移动到LC。最后,该模型可以在大多数国家轻松应用,以帮助决策者在其建筑项目中评估CWS和精益执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号