WHY CONFLICTS OCCUR IN ROADS AND TUNNELS PROJECTS IN NORWAY

机译:为什么在挪威的道路和隧道项目中发生冲突

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Conflicts within the Norwegian construction industry have reached unacceptable levels. The grievance of these disputes, whether it is the number of conflicts or the expense involved in these conflicts, is under discussion. This article examines the reasons for these conflicts in a comprehensive and inclusive manner. Twenty-five respondents with expertise and understanding of most conflicts in the Norwegian construction industry were interviewed. Results from a questionnaire sent to 1799 contractors have also been included in this study. Sixteen reasons for disputes were identified out of which four comprised the root causes. Tender specification and contract understanding came in first followed by "final settlement-payment related", corroborating previous findings. The third and fourth root causes of conflicts were "low priced contracts" and "changes in projects" respectively. Our findings point to design deficiencies and defective contract plans as significant causes of conflicts, confirming the view of construction experts. The third root cause of conflicts might explicate some aspects of the first and second major causes of disputes. It is also important to mention that though this is the general view, one can also see how every group involved in this study interpret major causes of conflicts. Our findings also point to "communication between clients and contractor", "carried out quantities" and "client restriction to time extension" as among the chief causes of conflicts, confirming the view of construction experts. Client understanding of contractors' anxiety and quest for sound contracting process are aspects that Norwegian clients are currently engaging in, for the sake of conflict reduction and prevention in future construction projects.
机译:挪威建筑业的冲突达到了不可接受的水平。在这些纠纷的申诉,是否是在这些冲突中涉及的冲突数量或费用,是在讨论这些冲突的裁决。本文以全面和包容的方式审查了这些冲突的原因。采访了二十五名具有专业知识和对大多数冲突的受访者进行了采访。送达1799份承包商的问卷的结果也被列入了本研究。鉴定了争议的十六个原因,其中四个包括根本原因。招标规范和合同谅解首先出现,然后“最终结算 - 付款相关”,证实了以前的调查结果。冲突的第三和第四根根源是“低价合同”和“项目的变化”。我们的研究结果指出了设计缺陷和有缺陷的合同计划作为冲突的重大原因,确认了建筑专家的看法。冲突的第三根根本原因可能会阐明争议的第一和第二主要原因的某些方面。提及这是一般认为,也可以看出这项研究中涉及的每个群体的主要原因也是如何解释冲突的主要原因。我们的调查结果还指出“客户与承包商之间的沟通”,“执行量”和“客户限制到时间延期”,如冲突的主要原因中,确认了建筑专家的看法。客户对承包商的焦虑和追求合理承包过程的理解是挪威客户目前正在参与的方面,以便在未来建设项目中的冲突和预防。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号