Looking Back versus Looking Ahead: Framing of Time and Work at Different Stages of a Project

机译:回顾和展望:项目不同阶段的时间和工作框架

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Progress on a well-defined project can be described along a task dimension in terms of amount done, or as amount of work still to be completed. Time-limited projects can also be described on a temporal dimension in terms of time spent versus time left. Five experiments are reported showing that such frames have predictable implications for speakers as well as for listeners: Statements by a team leader about time spent and work left are perceived as suggestions to "hurry up," whereas complementary statements about work done and time left indicate that the team can take it more easy. The first set of statements further implies that the team is behind schedule, whereas the last two statements suggest that the team is ahead of the plan. In line with this, speakers preferred work done and time left statements when they were ahead of schedule, but not when they were behind. "Hurry up" and "behind schedule" interpretations were also shown to be dependent upon stage, being more prominent in the final stages than during the initial stages of a project.
机译:可以在任务维度上按照已完成的数量或尚待完成的工作量来描述定义明确的项目的进度。限时项目也可以在时间维度上根据所花费的时间与剩余时间进行描述。据报道,有五个实验表明,这样的框架对说话者和听者都有可预测的影响:团队负责人关于所花费时间和剩余工作的陈述被认为是“加紧时间”的建议,而关于已完成工作和剩余时间的补充陈述则表明团队可以更轻松地完成任务。第一组陈述进一步暗示团队落后于进度,而最后两句话表明团队领先于计划。与此相符,发言者倾向于提前完成工作,而倾向于留出发言时间,而不是落后于时间。还显示“快点”和“进度落后”的解释取决于阶段,在最后阶段比在项目的初始阶段更为突出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号