Risk Management in the Construction Phase of Building Projects in Taiwan

机译:台湾建筑工程施工阶段的风险管理

获取原文
获取原文并翻译 | 示例
           

摘要

Project risk issues have seldom been addressed from the perspective of jobsite engineers. This study presents a novel approach for collecting risk management data in order to understand the realities of risk management in Taiwan. In this study, accumulation contributing ratio of risk and distance of controllability are utilized as the two proposed criteria to extract the consensus critical risks of practitioners. The data are analyzed from multiple points of view to explore the co-relationship among risk cause, risk strategy, risk result and project stage, and to clarify the risk mechanism and the realities of risk management. This analysis found that the risk is highest in the structure construction and finish work stages, and that schedule postpones and negotiation risk strategies are widely adopted by project managers in Taiwan for all risk results. Conclusions also included that contractors worries about the risk causes concerning natural phenomenon, and contract-related issues at the pre-construction stage which lead to schedule delay and cost overrun risk results.
机译:很少从现场工程师的角度解决项目风险问题。这项研究提出了一种收集风险管理数据的新颖方法,以便了解台湾风险管理的现实情况。在这项研究中,利用风险的累积贡献率和可控制性距离作为提出拟定从业人员共识性关键风险的两个拟议标准。从多角度对数据进行分析,以探讨风险原因,风险策略,风险结果和项目阶段之间的相互关系,并阐明风险机制和风险管理的现实。分析发现,在结构施工和完工阶段,风险最高,台湾的项目经理针对所有风险结果广泛采用了进度推迟和谈判风险策略。结论还包括承包商担心与自然现象有关的风险原因,以及在施工前阶段与合同相关的问题,这会导致进度延误和成本超支风险结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号