首页> 外文会议>World Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium >Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building
【24h】

Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

机译:复杂建设项目中的风险管理,适用可再生能源:以Energis教育和研究智能大楼的实现阶段为例

获取原文

摘要

Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner's expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
机译:如今,建筑业的一个特征特征是越来越多的项目的复杂性。几乎每个建筑项目都是独一无二的,具有其项目特定的目的,其自己的项目结构复杂性,所有者的期望,某个地点的基础条件,以及自己的动态。复杂建筑项目中不可预见的问题导致的失败成本和成本非常高。项目复杂性驱动程序将成功完成许多项目的成功完成了许多漏洞。本文讨论了复杂建设项目中有效风险管理的过程,其中利用了可再生能源的eNERGIS教学实验室建筑的实现阶段的例子,从Dormud S.A.,它的一般承包商。本文介绍了对应用可再生能源的复杂建设项目的风险管理新方法。风险管理进程分为六个阶段:收集信息,识别顶部,项目复杂性导致的关键项目风险,每个顶部的故障树的构建,临界风险,故障树的逻辑分析,定量风险评估施用风险反应策略的模糊逻辑与发展。开发了一种新的方法,对顶级的质量和定量风险评估,复杂建设项目中的批判风险。对危险性故障树分析进行了对一个最重要的风险的例子进行了风险评估。模糊集理论在拟议模型中的应用允许减少不确定性,消除基本事件概率的脆性价值的问题,在专家风险评估期间常见,目标是给出每个不需要的事件概率的确切风险得分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号