...
首页> 外文期刊>International Water Power & Dam Construction >Ecuadorian dam meets growing water demands
【24h】

Ecuadorian dam meets growing water demands

机译:厄瓜多尔大坝满足了不断增长的用水需求

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of La Mica dam in Ecuador was a technical challenge for the US-led joint venture responsible for the La Mica-Quito Sur water supply project. Quito in Ecuador, located at an elevation of 2896m in the Andes mountains, is one of the highest cities in the world. The area is surrounded by active and inactive volcanoes that have constrained its growth. All the same, the rural population has continued to move into Quito and its environs, creating a challenging water supply problem for the municipal water and wastewater agency responsible for water supply, sewerage, and drainage (EMAAP).
机译:厄瓜多尔的拉米卡大坝的建设是美国领导的负责拉米卡-基多苏尔供水项目的合资企业的一项技术挑战。厄瓜多尔的基多位于安第斯山脉海拔2896m,是世界上最高的城市之一。该地区被活跃和不活跃的火山所包围,这些火山限制了其生长。尽管如此,农村人口仍继续迁入基多及其周围地区,给负责供水,排污和排水(EMAAP)的市政供水和废水处理机构造成了一个充满挑战的供水问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号