首页> 外文期刊>ETEP-European Transactions on Electrical Power >Construction of UHV AC test base of SGCC
【24h】

Construction of UHV AC test base of SGCC

机译:国家电网公司特高压交流试验基地建设

获取原文
获取原文并翻译 | 示例
           

摘要

In order to research ultra high voltage (UHV) transmission technology systematically, State Grid Corporation of China launched the UHV AC test base project to provide strong technical support for UHV grid construction. The facilities including UHV power supply, UHV test lines, equipments qualified field, electromagnetic environmental laboratory, climate laboratory, UHV corona cage, impulse test field were built at the test base. Much useful experience had been achieved through the construction and research in the fields of UHV electromagnetic environment, external insulation characteristic, equipment technical requirements, equipments manufactory, electrical design, construction, test, and operation. It accelerated the construction of the UHV pilot project of China. Copyright © 2011 John Wiley & Sons, Ltd.
机译:为了系统地研究特高压输电技术,中国国家电网公司启动了特高压交流试验基地项目,为特高压电网建设提供有力的技术支撑。在试验基地建立了设施,包括特高压电源,特高压测试线,设备合格现场,电磁环境实验室,气候实验室,特高压电晕笼,脉冲试验场。通过在特高压电磁环境,外部绝缘特性,设备技术要求,设备制造,电气设计,构造,测试和操作等领域的建设和研究,已经获得了许多有益的经验。加快了中国特高压试验项目的建设。版权所有©2011 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号