Construction of UHV AC test base of SGCC

机译:国家电网公司特高压交流试验基地建设

获取原文

摘要

The construction of UHV AC test base of SGCC is an important component of the test demonstrationproject of UHV AC power transmission and transformation in China. The UHV AC test base, with thearea of about 140,000 square meters, is composed of a 220 kV power supply system, a 1 km UHVsingle-circuit test line, a 1 km UHV double-circuit test line in the same tower, a full voltage test yardfor UHV equipments, large current up-flow device, electromagnetic environment test area andshielding chamber, climate laboratory, UHV corona test cage and other ancillary facilities. Theestablishment of UHV AC test base will provide sufficient test conditions for the overall research ofUHV AC power transmission and transformation technology, such as the corona performance andelectromagnetic environment of UHV transmission lines, the external insulation characteristic of longinsulator string in conditions of low air pressure, pollution and ice, and the long-term test of UHVequipments in the case of full voltage and current. The paper introduces the layout, technicalrequirements, main test functions and difficulties in the construction of the UHV AC test base. The1000kV single-circuit and double-circuit test lines, full voltage test yard for UHV equipments, climatelaboratory, electromagnetic environment issues and optimal design of corona test cage are discussed indetail.
机译:国家电网公司特高压交流试验基地的建设是试验论证的重要组成部分 中国特高压交流输变​​电工程。特高压交流试验基地 占地约140,000平方米,由220 kV电源系统,1 km特高压组成 单回路测试线,同一塔中的1 km特高压双回路测试线,全电压测试场 适用于特高压设备,大电流上流装置,电磁环境测试区域和 屏蔽室,气候实验室,特高压电晕测试笼和其他辅助设施。这 特高压交流试验基地的建立将为整体研究提供足够的试验条件。 特高压交流输变​​电技术,如电晕性能和 特高压输电线路的电磁环境,外部绝缘特性长 低气压,污染和冰块条件下的绝缘子串以及特高压的长期测试 设备在满电压和电流的情况下。本文介绍了版式,技术 要求,主要测试功能以及特高压交流测试基地建设中的困难。这 1000kV单回路和双回路测试线,超高压设备的全电压测试场,气候 在实验室中,讨论了电磁环境问题和电晕测试笼的优化设计 细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号