首页> 外文期刊>International railway journal >Three-track San Martin Line viaduct opens in Buenos Aires
【24h】

Three-track San Martin Line viaduct opens in Buenos Aires

机译:三轨圣马丁线高架桥在布宜诺斯艾利斯开业

获取原文
获取原文并翻译 | 示例
           

摘要

PASSENGER trains started operating along a new three-track elevated section of the San Martin Line in Buenos Aires on July 10 as part of a $US 500m project to upgrade and electrify the line. The 5km elevated section between Palermo and La Paternal has eliminated 11 level crossings where road users faced delays of up to 20 minutes. Construction of two new stations at Villa Crespo and Chacarita is continuing, while renovation of the San Martin Retire station in the centre of Buenos Aires will be completed in the next few months, followed by electrification of the commuter rail line, which links Buenos Aires with Pilar and Dr Cabred.
机译:7月10日在布宜诺斯艾利斯的San Martin系列新的三轨高架部分开始沿着圣马丁线的新三轨高架部分开展,作为US $ 500M项目的一部分,可以升级和电动线路。巴勒莫和洛杉矶之间的5公里升高的部分已经消除了11个级别的交叉口,道路用户面临长达20分钟的延迟。在Villa Crespo和Chacarita的两个新电台的建设是持续的,而布宜诺斯艾利斯市中心的圣马丁退休站的翻新将在未来几个月内完成,其次是通勤轨道线的电气化,这与布宜诺斯艾利斯联系起来Pilar和Cabred博士。

著录项

  • 来源
    《International railway journal》 |2019年第8期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号