首页> 外文期刊>International Journal of Strategic Property Management >In terpreting resourcing bottlenecks of post‐Wenc huan earthquake reconstruction in China
【24h】

In terpreting resourcing bottlenecks of post‐Wenc huan earthquake reconstruction in China

机译:解读中国汶川地震灾后重建的资源瓶颈

获取原文
获取原文并翻译 | 示例
           

著录项

  • 来源
  • 作者单位

    Department of Civil and Environmental Engineering, The University of Auckland, Private Bag 92019, Auckland Mail Centre, Auckland, 1142, New Zealand Phone: 64 2102601805 E-mail:;

    Department of Civil and Environmental Engineering, The University of Auckland, Private Bag 92019, Auckland, 1061, New Zealand E-mail:;

    School of Architecture (ScALA), UNITEC, Building 1, Carrington Road Mt Albert, Private Bag 92025, Auckland, New Zealand E-mail:;

    Department of Civil Engineering, University of Canterbury, Private Bag 4800, Christchurch, 8140, New Zealand E-mail:;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号