首页> 外文期刊>nternational Journal of Shipping and Transport Logistics >The impact of information sharing on installation processes of offshore wind farms - process modelling and simulation-based analysis
【24h】

The impact of information sharing on installation processes of offshore wind farms - process modelling and simulation-based analysis

机译:信息共享对海上风电场安装过程的影响-过程建模和基于仿真的分析

获取原文
获取原文并翻译 | 示例
           

摘要

The installation of offshore wind energy turbines is accompanied by great challenges arising from the dynamic environment, which influences logistics processes. Communication plays a major role for cost-efficient installation processes, due to the coordination needed between different partners involved in the offshore wind energy supply chain. A detailed process analysis revealed the importance of shared information about weather conditions, storage capacities and vessel availabilities. By applying a simulation study, which evaluates eight information sharing scenarios, the influence of the following execution time-related performance measures is investigated: average time in manufacturer storage, average time in port, total installation time and average vessel usage time. As a result, the simulation study verifies that sharing information between supply chain partners can contribute to more efficient logistics processes. However, the achievable prediction accuracy and the interdependencies between the information items have a major influence on the quality of results.
机译:海上风能涡轮机的安装伴随着动态环境带来的巨大挑战,这会影响物流流程。由于海上风能供应链中涉及的不同合作伙伴之间需要进行协调,因此沟通对于节约成本的安装过程起着重要作用。详细的过程分析表明,共享有关天气状况,存储容量和船只可用性的信息的重要性。通过应用评估八种信息共享方案的仿真研究,研究了以下与执行时间相关的性能指标的影响:制造商存储平均时间,港口平均时间,总安装时间和平均船只使用时间。结果,仿真研究验证了供应链合作伙伴之间的信息共享可以有助于提高物流效率。但是,可达到的预测精度和信息项之间的相互依赖性对结果的质量有重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号