首页> 外文期刊>International journal of river basin management >Optimization of reservoir operation using linear program, case study of Riam Jerawi Reservoir, Indonesia
【24h】

Optimization of reservoir operation using linear program, case study of Riam Jerawi Reservoir, Indonesia

机译:使用线性程序优化水库运行,以印度尼西亚里亚姆·耶拉维水库为例

获取原文
获取原文并翻译 | 示例
       

摘要

The pattern of water use operation is important to ensure the continuity of water supply system of a reservoir. This pattern, which is usually called power rule curve in a hydropower system, should be optimally obtained, so that the yielded electrical power also becomes optimal while the continuity of reservoir storage can also be tenable. In this study, in order to satisfy the main objective of Riam Jerawi Reservoir, where the energy of 6 MW should be provided every month, a linear optimization model is applied for three objective functions such as maximizing total energy, maximizing minimum energy and minimizing energy shortage. In addition, a simulation model is also presented for comparison purpose particularly to emphasize some disadvantages of using this model. The results show that the optimum energy can be achieved by applying this optimization model where the continuity of reservoir volume is also satisfied. Meanwhile, the simulation model produces the rule curve, which cannot satisfy the continuity criterion. This optimization model is expected to be applied for other similar cases and give the optimum power rule curve for the related stakeholders.
机译:用水操作方式对于确保水库供水系统的连续性很重要。应该最佳地获得这种模式(通常在水电系统中称为功率规则曲线),以使产生的电功率也变得最优,同时水库的连续性也可以维持。在这项研究中,为了满足Riam Jerawi水库每月要提供6 MW能量的主要目标,针对三个目标函数应用了线性优化模型,例如最大化总能量,最大化最小能量和最小化能量。短缺。此外,还提供了一个仿真模型以进行比较,以特别强调使用此模型的一些缺点。结果表明,在满足储层体积连续性的情况下,通过应用该优化模型可以达到最优能量。同时,仿真模型产生了不能满足连续性准则的规则曲线。该优化模型有望应用于其他类似情况,并为相关利益相关者提供最佳功率规则曲线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号