Capturing the stakeholders' managerial competency risks of mega infrastructure projects: a fuzzy logic modelling approach

机译:捕获大型基础设施项目的利益相关者的管理能力风险:一种模糊逻辑建模方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper develops a fuzzy-logic model to aggregate the numerous managerial risks driven by the various project stakeholders at different project stages. The model accounts for the various perceptions of assessors involved in the risk evaluation process. The proposed model provides means for performing scenario analysis at an early project procurement stage to manage macro risks. Four managerial processes or competencies were considered as critical success factors for infrastructure projects. These are communication, coordination, knowledge sharing and decision-making. A Sugeno fuzzy logic model was calibrated using three input variables representing the importance of the various projects stakeholder groups, the criticalness level of the management process as perceived by the various groups at the various project stages, and the effectiveness level of the management competency. The model was validated using surveys of various stakeholder groups of a mega project.
机译:本文开发了一种模糊逻辑模型,以汇总由不同项目利益相关者在不同项目阶段驱动的众多管理风险。该模型考虑了风险评估过程中评估者的各种看法。提出的模型提供了在项目早期采购阶段进行情景分析以管理宏观风险的方法。四个管理流程或能力被认为是基础架构项目成功的关键因素。这些是沟通,协调,知识共享和决策。使用三个输入变量对Sugeno模糊逻辑模型进行了校准,这些输入变量表示各个项目利益相关者群体的重要性,各个项目团队在各个项目阶段所感知的管理过程的关键程度以及管理能力的有效性水平。该模型已通过对大型项目的各个利益相关者群体的调查进行了验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号