首页> 外文期刊>International Journal of Project Management >Use of fuzzy numbers in project risk (criticality) assessment
【24h】

Use of fuzzy numbers in project risk (criticality) assessment

机译:在项目风险(关键)评估中使用模糊数

获取原文
获取原文并翻译 | 示例
       

摘要

We put forward a fuzzy way of measuring the criticality of project activities and of the whole project. In the proposed approach both the decision maker attitude and the project network structure are taken into account. The criticality measure obtained may serve as a measure of risk or of the supervision effort needed and can help in making the decision whether to accept or to reject the project. Its numerical implementation is as difficult as that of the classical CPM method.
机译:我们提出了一种模糊的方法来衡量项目活动和整个项目的重要性。在提出的方法中,决策者的态度和项目网络结构都被考虑在内。获得的关键度度量可以用作风险度量或所需监督工作的度量,并且可以帮助做出决定是接受还是拒绝项目的决定。其数值实现与经典CPM方法一样困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号