首页> 外文期刊>International Journal of Project Management >Project scheduling for collaborative product development using DSM
【24h】

Project scheduling for collaborative product development using DSM

机译:使用DSM进行协作产品开发的项目计划

获取原文
获取原文并翻译 | 示例
       

摘要

New Product Development (NPD) is an important and complex business process. It constitutes a major contributor to the business excellence of any industry. In recent years, NPD has become more and more competitive and globalised. However, scheduling and managing the global collaborated NPD process for large projects is a difficult exercise that requires much effort and experience. An examination of current project scheduling tools reveals the weakness in various areas, such as sequencing, monitoring and controlling the NPD process. This paper presents a project scheduling and rescheduling framework based on DSM (Design Structure Matrix) to deal with the weakness mentioned. An example is provided to illustrate the proposed framework.
机译:新产品开发(NPD)是重要且复杂的业务流程。它是任何行业卓越业务的主要贡献者。近年来,NPD已变得越来越具有竞争力和全球化。但是,为大型项目安排和管理全球协作NPD流程是一项艰巨的工作,需要大量的精力和经验。对当前项目进度工具的检查揭示了各个领域的弱点,例如排序,监视和控制NPD过程。本文提出了一种基于DSM(设计结构矩阵)的项目进度计划和重新计划框架,以解决上述缺点。提供了一个示例来说明建议的框架。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号