首页> 外文期刊>International Journal of Project Management >How project managers can better control the performance of design-build projects
【24h】

How project managers can better control the performance of design-build projects

机译:项目经理如何更好地控制设计建造项目的绩效

获取原文
获取原文并翻译 | 示例
       

摘要

The purpose of this study is to identify key factors that affect 11 areas of design-build (DB) project performance. Using data from 42 public and private DB projects, this study finds that contractor characteristics are the key determinants that affect the most number of performance metrics. The most important variable is the contractor's track record for completing projects on budget, on schedule and to acceptable level of quality. Other important determinants are contractors' capability and adequacy of their resources. It is recommended that project managers pay close attention to contractor selection in order to ensure that the different aspects of project performance are achieved.
机译:这项研究的目的是确定影响设计-建造(DB)项目绩效的11个领域的关键因素。这项研究使用来自42个公共和私有DB项目的数据,发现承包商的特征是影响最多绩效指标的关键决定因素。最重要的变量是承包商的跟踪记录,以按预算,按计划并达到可接受的质量水平完成项目。其他重要的决定因素是承包商的能力和资源的充足性。建议项目经理密切注意承包商的选择,以确保实现项目绩效的各个方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号