Researchers have conducted numerous studies comparing project performance of design-bid-build (DBB) and design-build (DB) highway projects. However, little research has been done to compare the performance of DB and construction manager/general contractor (CM/GC) highway projects. Therefore, an exploratory study was conducted to compare the performance of 55 DB and 34 CM/GC highway projects from various States Departments of Transportation (DOTs) in terms of cost, change orders, and construction intensity. The results showed that contract award cost growth was significantly lower in DB projects than in CM/GC projects. In contrast to this, the total cost growth of DB projects was higher than that of CM/GC projects. In terms of change order cost factor and construction intensity, DB projects were found to be superior to CM/GC projects. However, no statistical difference was found.
机译:研究人员已经进行了无数研究,比较了设计—投标—建造(DBB)和设计—建造(DB)公路项目的项目性能。但是,很少有研究比较DB和建筑经理/总承包商(CM / GC)公路项目的性能。因此,进行了一项探索性研究,以比较美国交通部(DOT)的55个DB和34个CM / GC高速公路项目在成本,变更单和施工强度方面的性能。结果表明,DB项目的合同授予成本增长明显低于CM / GC项目。与此相反,DB项目的总成本增长高于CM / GC项目的总成本增长。在变更单成本因素和施工强度方面,发现DB项目优于CM / GC项目。但是,没有发现统计差异。

著录项

  • 作者

    Shakya Binita;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类
  • 入库时间 2022-08-20 21:05:37

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号