首页> 外文期刊>International Journal of Project Management >A heuristic project scheduling approach for quick response to maritime disaster rescue
【24h】

A heuristic project scheduling approach for quick response to maritime disaster rescue

机译:一种快速响应海上灾难救援的启发式项目计划方法

获取原文
获取原文并翻译 | 示例
           

摘要

Maritime disaster can cause loss of human life and economy, as well as environment damage. Also the disaster rescue is difficult for the complexity of rescue process. Disaster rescue is emergent and urgent most of the time; therefore, quick response is rather important. The existing knowledge always supplies some strategies and generates a rescue plan by human expertise manual decision-making. The rescue plan obtained manually may be not a good one due to the lack of time available for human decision-makers to make decisions. To overcome limited time pressure, while retaining minimum rescue project duration, a rescue plan for the maritime disaster rescue is obtained with the application of heuristic resource-constrained project scheduling approach in this paper. Meanwhile a heuristic algorithm is proposed to generate the minimum project duration and the activities start times. To study its performance, 20 maritime rescue examples (21-50 activities) were tested. By comparing with those generated by the manual decision-making method, the results generated by heuristic algorithm indicate high efficiency. It also identifies the critical chain of the rescue project, which can help decision-makers control the rescue process efficiently.
机译:海事灾难可能会导致人员伤亡和经济损失,并破坏环境。而且,由于救援过程的复杂性,灾难救援很困难。在大多数情况下,灾难救援是紧急而紧急的;因此,快速响应非常重要。现有知识总是提供一些策略,并通过人类专业知识手动决策制定救援计划。由于缺乏时间供人类决策者做出决策,手动获得的救援计划可能不是一个好方案。为了克服有限的时间压力,在保持最小的救援项目持续时间的前提下,采用启发式资源受限的项目调度方法,制定了海上灾害救援计划。同时提出一种启发式算法,以生成最小的项目持续时间和活动开始时间。为了研究其性能,测试了20个海上救援实例(21-50个活动)。通过与手动决策方法生成的结果进行比较,启发式算法生成的结果表明效率很高。它还确定了救援项目的关键链,可以帮助决策者有效地控制救援过程。

著录项

  • 来源
    《International Journal of Project Management》 |2009年第6期|620-628|共9页
  • 作者单位

    Institute of Computer Integrated Manufacturing Institute, School of Mechanical Engineering, Shanghai Jiaotong University, No. 800, Dongchuan Road, Shanghai, China;

    Institute of Computer Integrated Manufacturing Institute, School of Mechanical Engineering, Shanghai Jiaotong University, No. 800, Dongchuan Road, Shanghai, China Shanghai Key Laboratory of Advanced Manufacturing Environment, Room 1206, Haoran High-tech Building, No.1954, Huashan Road, Shanghai, China;

    Institute of Computer Integrated Manufacturing Institute, School of Mechanical Engineering, Shanghai Jiaotong University, No. 800, Dongchuan Road, Shanghai, China;

    Institute of Computer Integrated Manufacturing Institute, School of Mechanical Engineering, Shanghai Jiaotong University, No. 800, Dongchuan Road, Shanghai, China Shanghai Key Laboratory of Advanced Manufacturing Environment, Room 1206, Haoran High-tech Building, No.1954, Huashan Road, Shanghai, China;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    resource-constrained project; scheduling; disaster rescue; heuristics;

    机译:资源受限的项目;排程灾难救援;启发式;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号