Overcoming resistance to change in engineering and construction: Change management factors for owner organizations

机译:克服工程和施工变更的阻力:所有者组织的变更管理因素

获取原文
获取原文并翻译 | 示例
       

摘要

For owner organizations in the architecture, engineering, and construction industry, successful implementation of new processes for procuring, contracting, and managing requires a concerted change management effort. The objective of this study was to empirically measure the impact of individual change management factors on minimizing resistance from organizational members during implementation, which is often cited as a major reason for organizational change failure. Project team resistance to the implementation of a new project delivery system was tracked across sixteen owner organizations. Findings include identification of six change management factors that contribute to minimizing resistance to change, including certain aspects of project scope, size and duration, organizational expectations of change implementation speed, the establishment of formal change agents, and the level of change agent involvement with implementation activities. Implications for change leaders and practitioners are discussed to recommend strategies for reducing resistance to change. (C) 2015 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:对于建筑,工程和建筑行业的所有者组织,成功实施采购,承包和管理新流程需要协调一致的变更管理工作。这项研究的目的是凭经验衡量个人变更管理因素对最大限度地减少组织成员在实施过程中的抵制的影响,这通常被认为是组织变更失败的主要原因。在16个所有者组织中跟踪了项目团队对实施新项目交付系统的抵制。调查结果包括确定有助于最小化对变更的抵制的六个变更管理因素,包括项目范围,规模和期限的某些方面,变更实施速度的组织期望,正式变更代理的建立以及变更代理参与实施的程度活动。讨论了对变革领导者和实践者的影响,以建议减少变革阻力的策略。 (C)2015 Elsevier Ltd. APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号