首页> 外文期刊>International Journal of Project Management >Barriers to the use of an IT Project Management Methodology in a large financial institution
【24h】

Barriers to the use of an IT Project Management Methodology in a large financial institution

机译:在大型金融机构中使用IT项目管理方法的障碍

获取原文
获取原文并翻译 | 示例
       

摘要

The global financial crisis of 2008 demanded greater control mechanisms from the financial service industry. The IT Project Management Methodology (PMM) is considered an important control mechanism for IT governance to support managers in achieving more predictable rates of project management success (PMS). The aim of this study is to further investigate how an implemented IT PMM that contributes to PMS is used in a large Brazilian financial institution. A case study was conducted on one of the largest financial institutions in the world that is located in Brazil by means of interviews, analysis of a database of 3047 IT projects and a survey of 347 IT professionals. The study showed that, despite the belief of 90% of the IT professionals that the use of an IT PMM improves PMS rates, there are five main barriers that prevent its proper use: very tight project deadlines; working as both a developer and a project manager; working simultaneously on several projects; difficulty using the project management software; and a lack of knowledge of the PMM. Finally, an action plan to solve these issues is presented. (C) 2015 Elsevier Ltd. APM and TPMA. All rights reserved.
机译:2008年的全球金融危机要求金融服务业采取更大的控制机制。 IT项目管理方法论(PMM)被认为是IT治理的重要控制机制,可支持管理人员实现可预测的项目管理成功率(PMS)。这项研究的目的是进一步调查在大型巴西金融机构中如何使用有助于PMS的已实施IT PMM。通过采访,对3047个IT项目的数据库进行分析以及对347名IT专业人员进行的调查,对位于巴西的世界上最大的金融机构之一进行了案例研究。该研究表明,尽管90%的IT专业人员认为使用IT PMM可以提高PMS率,但是仍然存在五个阻碍其正确使用的主要障碍:非常紧迫的项目期限;同时担任开发人员和项目经理;同时在几个项目上工作;使用项目管理软件有困难;并且缺乏对PMM的了解。最后,提出了解决这些问题的行动计划。 (C)2015 Elsevier Ltd. APM和TPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号