首页> 外文期刊>International Journal of Project Management >Organizing external stakeholder engagement in inter-organizational projects: Opening the black box
【24h】

Organizing external stakeholder engagement in inter-organizational projects: Opening the black box

机译:组织外部利益相关者参与组织间项目:打开黑匣子

获取原文
获取原文并翻译 | 示例
       

摘要

External stakeholder engagement is crucial for delivering value to diverse stakeholders in inter-organizational projects, however, it is not straightforward to organize this in a way that adds value. The intra-organizational focus of previous research offers limited insights into the relevant roles, responsibilities, arrangements and activities in inter-organizational contexts. Moreover, comprehensive empirical studies of the phenomenon are rare. This study explicates how internal stakeholders organize external stakeholder engagement in inter-organizational projects. Our multiple-case study of two infrastructure projects in Northern Europe identified three organizing solutions based on governance, values and dynamism. While governance-based solutions provide an overall structure for organizing external stakeholder engagement, value-based solutions ensure genuine cooperation and dynamism-based solutions facilitate timely organizing. The study develops propositions that constitute a model of how external stakeholder engagement can be organized in inter-organizational projects. The findings have implications for project stakeholder management and mainstream stakeholder research.
机译:外部利益相关者的参与对于在组织间项目中为不同的利益相关者提供价值至关重要,但是,以增加价值的方式组织这种利益并非易事。先前研究对组织内的关注仅提供了对组织间环境中相关角色,职责,安排和活动的有限见解。而且,对该现象进行全面的实证研究是很少的。这项研究阐明了内部利益相关者如何组织外部利益相关者参与组织间项目。我们对北欧两个基础设施项目的多案例研究确定了基于治理,价值和活力的三种组织解决方案。基于治理的解决方案为组织外部利益相关者的参与提供了总体结构,而基于价值的解决方案可确保真正的合作,而基于动态的解决方案则有助于及时组织。该研究提出的命题构成了如何组织外部利益相关者参与组织间项目的模型。这些发现对项目利益相关者的管理和主流利益相关者的研究具有启示意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号