External stakeholder management and engagement on urban construction projects in Ireland

机译:外部利益相关者管理与爱尔兰城市建设项目的参与

获取原文
获取原文并翻译 | 示例
       

摘要

The disruptive nature of urban construction projects results in hazardous and complex environments, particularly when considering the management of external stakeholders. Therefore, this paper aims to identify who these external stakeholders are, what issues occur and what strategies are used to counteract such issues on urban construction projects in Ireland. The research method is qualitatively based, encompassing five exploratory case study interviews with five construction professionals on urban construction projects in Ireland. The data are qualitatively assessed using mind-mapping software and cognitively summarised. The research identifies 'residents', 'road users', 'environmental agencies' and the 'local authority' as the main external stakeholders, from a potential list of 22. 'Traffic management', 'noise', 'dust and vibrations from site works', 'excess documentation' and 'environmental controls' were identified as the main issues, from a list of 26 issues. Finally, 'consultations', 'regular meetings', 'traffic-management systems', 'inform stakeholders early', 'noise-monitoring reports' and 'sustainable construction methods' were identified as the main response strategies, from a list of 15 potential strategies. The key contribution of this study illustrates to on-site management the importance of identifying and engaging with the external stakeholders, in addressing their issues and, subsequently, counteracting such concerns using one or more response strategies identified.
机译:城市建设项目的破坏性导致危险和复杂的环境,特别是在考虑外部利益相关者的管理时。因此,本文旨在确定这些外部利益攸关方是谁,发生了哪些问题以及用于抵消爱尔兰城市建设项目此类问题的问题。研究方法是基于定性的,包括五个探索性案例研究访谈,五位建筑专业人员在爱尔兰城市建设项目。使用思维映射软件进行定性评估数据,并认知地汇总。该研究将“居民”,“道路用户”,“环境机构”和“地方当局”为主要的外部利益攸关方,从22个潜在名单中列出。“交通管理”,“噪音”,“灰尘和现场振动”作品',“超额文件”和“环境控制”被确定为主要问题,从26个问题的清单中。最后,“磋商”,“常规会议”,“交通管理系统”,“提前”,“噪音监测报告”和“可持续施工方法”被确定为主要响应策略,从15个潜力清单中被确定为主要响应策略策略。本研究的关键贡献说明了现场管理层,在解决其问题时识别和参与外部利益相关者的重要性,并随后抵消了所确定的一个或多个响应策略来抵消这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号