...
首页> 外文期刊>International Journal of Production Research >Tool replacement policies for a machining centre producing multiple types of products with distinct due dates
【24h】

Tool replacement policies for a machining centre producing multiple types of products with distinct due dates

机译:生产具有不同到期日期的多种类型产品的加工中心的刀具更换政策

获取原文
获取原文并翻译 | 示例
           

摘要

This paper focuses on a tool replacement problem to determine tool replacement schedules in a machining centre that produces multiple types of products with given due dates using multiple types of tools. For the problem, we develop new tool replacement policies with the objective of minimizing the sum of tool pur- chasing costs, material costs, and the tardiness penalty costs of not meeting due dates. In these policies, tool replacement intervals or exact times for tool replace- ments are determined using the information on the accumulated actual processing time and the processing time of the operation.
机译:本文着重于工具更换问题,以确定在加工中心中使用多种类型的工具生产具有给定到期日期的多种类型产品的加工中心中的工具更换时间表。针对该问题,我们制定了新的工具更换政策,其目的是将工具采购成本,材料成本以及未按时交付的拖延罚款成本的总和最小化。在这些策略中,使用有关累计的实际处理时间和操作的处理时间的信息来确定工具的更换间隔或工具的确切更换时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号